Yoga wear MOQ and lead time, explained by route

Minimum order quantity and lead time are set by how a garment is made, not by a price list. Below are the reference ranges we see in the two clusters we work in, and the levers that move them for a specific program.

Illustration: fabric rolls labelled by color waiting beside a cutting table

Why there is no single MOQ for yoga wear

A buyer asking "what is your MOQ" usually gets one number. That number hides the real question: which production route will your style use, and what does that route need to run efficiently? A legging knitted on a seamless circular machine and a legging cut from a fabric roll and sewn on a flatlock machine are different jobs with different setup costs. The MOQ follows the setup.

We quote MOQ per style and per color, because that is how factories plan. A style is one pattern or one knitting program. A color is one dye lot. Sizes can usually be mixed inside the color quantity, which matters for brands that need a full size run without overbuying the middle sizes.

Reference ranges by route

ItemCut and sew (Humen cluster)Seamless knit (Yiwu cluster)
MOQ per style per colorTypically 100-300 pcsTypically 300-500 pcs
Size mixingUsually allowed within the color quantityUsually allowed within the color quantity
First sampleTypically 7-15 daysTypically 7-15 days once the knitting program is written
Bulk productionTypically 30-45 days after sample approvalTypically 30-45 days after sample approval
What drives setupMarker making, cutting, sewing line balanceKnitting program per style, machine changeover, yarn dyeing

These are typical reference ranges from stated terms of private label makers in the two clusters. They are not a quotation. For each program the MOQ, sampling time and bulk lead time are confirmed in writing before any deposit is paid.

What pushes the MOQ up or down

Fabric availability

If the partner mill holds your fabric in greige (undyed) form, the factory only needs to dye the quantity you order, and lower MOQs are realistic. A custom fabric, a custom color with a minimum dye lot, or a special finish such as brushing on a specific base often sets a fabric minimum that is higher than the garment minimum. In that case the fabric, not the sewing, decides your MOQ. Read more in the fabric library.

Construction

Simple styles with few panels run at the lower end of the range. Styles with gussets, pockets, bonded edges, removable cups or color blocking add operations and are planned with more care. Seamless styles sit higher because each new style needs its own knitting program and machine time before the first good piece comes off.

Trims and branding

Custom elastic, printed waistband tape, molded cups in a new shape and woven labels all have their own supplier minimums. A heat transfer logo is usually flexible; a custom jacquard elastic is not. See private label options for the trims that most often set a floor.

How lead time is built

  1. Brief and route decision - one to a few days once the reference and fabric family are clear.
  2. Fabric sheet and first sample - typically 7-15 days after fabric and spec are agreed.
  3. Fit comments and second sample if needed - depends on how many changes are made.
  4. Written confirmation - MOQ, unit price, colors, labels, packaging and ship date confirmed in writing.
  5. Fabric dyeing and bulk production - typically 30-45 days after sample approval, including inspection.
  6. Packing and shipping - transit time depends on the shipping method and destination.

The step buyers underestimate most is the second sample. Every round of fit changes adds sampling time. A complete tech pack with measurements and tolerances is the single most effective way to shorten the calendar.

Small first orders and reorders

Many brands start with two or three styles in two colors to test the market. On the cut and sew route that is often possible at the lower end of the range, especially when the fabric is an existing mill quality. On the seamless route, buyers usually start with fewer styles and more pieces per style.

Reorders are easier than first orders. The pattern or knitting program already exists, the fabric is known, and the approved sample is the reference. Reorder MOQs and lead times are also confirmed in writing, and they are often shorter when the fabric can be dyed from stock. Our note on reorder planning covers how to split a reorder by color and size.

Mixed collections across both routes

A first collection often mixes routes: seamless ribbed sets from the Yiwu cluster and cut and sew leggings with pockets from the Humen cluster. That is workable, but each route keeps its own MOQ and calendar. Plan the launch date around the slower item, and expect two sets of samples, two inspections and two carton streams that are consolidated before shipping. The desk confirms in writing which factory makes which style, so the written order reflects both routes rather than a blended figure that neither factory recognizes.

What to send for a fast, accurate answer

  • Reference photos or links for each style, and whether you want seamless or cut and sew if you already know.
  • The fabric family or the performance you need: opacity, compression, softness, cotton feel.
  • The number of styles and colors, and a quantity range per style.
  • Branding: logo method, labels, hang tags, packaging.
  • The date the goods need to be in your warehouse and the delivery terms you prefer.

With that, the desk can reply with the route, the reference MOQ for your fabric and construction, and a sampling plan. Send a brief when you are ready.

MOQ, cut and sew
Typically 100-300 pcs per style per color
MOQ, seamless
Typically 300-500 pcs per style per color
Size mix
Usually allowed within the MOQ
First sample
Typically 7-15 days
Bulk
Typically 30-45 days after sample approval
Status
All figures confirmed in writing per program

Questions buyers ask

Is the MOQ per style or per color?

Per style and per color. A style is one pattern or knitting program and a color is one dye lot. Sizes can usually be mixed within the quantity for each color. The exact rule for your program is confirmed in writing.

Why is the seamless MOQ higher?

Each seamless style needs its own knitting program and machine time before production runs smoothly, and yarn is usually dyed before knitting. That setup is spread over the order, so seamless programs typically start at 300-500 pcs per style per color.

Can I order below the reference MOQ?

Sometimes, when the fabric is an existing mill quality in a stock color and the construction is simple. The partner factory decides case by case, and any lower quantity is confirmed in writing together with its unit price.

When does the lead time start?

Bulk lead time is counted from sample approval and written order confirmation, with fabric available. Sampling time comes before that. Shipping transit is added after production.

Are sample costs refunded on order?

Sample charges and whether they are credited against a bulk order are set per program and confirmed in writing before sampling starts.

Send a style reference, the fabric you have in mind and a quantity range. The desk replies in writing with a sampling route and the open questions.